- Home
- Spare Parts
- Services
- About Us
- Contact Us
- Purchase
MTM130 Grinding Mill Spare Parts
Wear Parts of MTM130 Grinding Mill
-
Oil Reservoir Assembly
Fastened at the center of Classifier, under the Vanes Turntable.
-
Pressure Nut
Pressure Nuts are installed at the bottom of Roller Assembly.
-
Rubber Sleeve
Rubber Sleeves are installed between Quincunx and Cross Shaft.
-
Ring
ing is installed in the Lower Body, surrounding the Rollers.
-
Roller Assembly
Roller Assembly is the most important part of grinding mill.
-
Quincunx
Installed at the top of main shaft of grinding mill.
-
Cross Shaft
Cross Shaft is installed cross Roller Assembly, and is fastened at Quincunx.
-
Vane
anes are installed on the turntable, which is fastened on the main sha
-
Spring Tension Rod
Installed above the Quincunx, through springs in the inner of Lower Body.
-
Spring
MTM series grinding mill has two sorts of springs.
-
Shovel
Shovels are fasten on the Rotatory Table, aside Rollers and Ring.